Renewable Energy Projects
PV - Chillan-San Alberto [CSA]
Photovoltaic Parks: Projects & Business Development
SOLAR PROJECT: 3 MWp
23 hectares
Yield: 1.963 kwh/m2/year
Interconnection Distance: 1.400 m.
Voltage connection: 15 kV.
ICC Value: USD 161.415
Node Price Reference: Charrúa
Altitude: 130 m.
Minning Rights: In Process
Environmental Status: Ok
IFC Status: In Process
COMMERCIALS CONDITIONS
Development and finish construction: 1 year
Construction time: 6 months.
Operation time: 25 years.
Payments:
Project sale Price:
OPPORTUNITIES
Limited supply of PMGD projects that can benefit from a stabilized price
WEAKNESSES
Irradiation lower than projects located in RM, VI, VII region.
STRENGHTS
Project received at a stabilized price.
Use of land suitable for the type of project.
Cheap interconnection of a few meters of line and short easements.
Development cost included.
Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.
Reduced deadlines to start receiving income, less than a year
STUDIES & AVALAIBLE INFORMATION
Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.
Studies and analysisfor sectorial permits.
Minning Cadastre.
Basic Engineering of interconnection and comunicationsfor 3 MW Project.
Topography studies.
Hidrology studies.
Preliminary Soil test.
Irradiation studies.
Real estate titles studies.