CHILE: Cachapoal Province, O’Higgins Region. Location: 4 km to the north-east from Coltauco, next to route H30
Photovoltaic Parks: Projects & Business Development
6 hectares
Yield: 2.040 kwh/m2/year
Interconnection Distance: 1.800 m.
Voltage connection: 15 kV.
ICC Value: USD 15.000
Node Price Reference: Alto Jahuel
Altitude: 285 m.
Minning Rights: In Process
Environmental Status: Ok
IFC Status: Approved
Development and finish construction: 1 year.
Construction time: 6 months.
Operation time: 25 years.
Payments:
Project sale Price:
Limited supply of PMGD projects that can benefit from a stabilized price
Project in north zone, with very good radiation.
Project received at a stabilized price.
High radiation.
Use of land suitable for the type of project.
Cheap interconnection of a few meters of line and short easements.
Development cost included.
Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.
Reduced deadlines to start receiving income, less than a year.
Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.
Studies and analysisfor sectorial permits.
Minning Cadastre.
Basic Engineering of interconnection and comunicationsfor 3 MW Project.
Topography studies.
Hidrology studies.
Preliminary Soil test.
Irradiation studies.
Real estate titles studies.