Renewable Energy Projects
PV - El Palqui - Exser [EPE]
CHILE: Ovalle Province, Coquimbo Region. 2.450 km to the north from Santiago
Photovoltaic Parks: Projects & Business Development
SOLAR PROJECT: 3 MWp
7,5 hectares
Yield: 2.327 kwh/m2/year
Interconnection Distance: 600 m.
Voltage connection: 13,2 kV.
ICC Value: TBD
Node Price Reference: Pan de Azucar
Altitude: 420 m.
Minning Rights: Registered
Environmental Status: Ok
IFC Status: Approved
COMMERCIALS CONDITIONS
Development and finish construction: 1 year.
Construction time: 6 months.
Operation time: 25 years.
Payments:
Project sale Price:
OPPORTUNITIES
Limited supply of PMGD projects that can benefit from a stabilized price
Project in north zone, with very good radiation.
STRENGHTS
Project received at a stabilized price.
High radiation.
Use of land suitable for the type of project.
Cheap interconnection of a few meters of line and short easements.
Development cost included.
Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.
Reduced deadlines to start receiving income, less than a year.
STUDIES & AVALAIBLE INFORMATION
Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.
Studies and analysisfor sectorial permits.
Minning Cadastre.
Basic Engineering of interconnection and comunicationsfor 3 MW Project.
Topography studies.
Hidrology studies.
Preliminary Soil test.
Irradiation studies.
Real estate titles studies.