Renewable Energy Projects


PV - San Clemente-Flor del Llano [SCF]

CHILE: Talca Province, Maule Región. -/- 250 km to the south from Santiago



Photovoltaic Parks: Projects & Business Development

SOLAR Project: 6,5 MWp

  • 12 hectares

  • Yield: 1945 kwh/m2/year

  • Interconnection Distance: 900 m.

  • Voltage connection: 13,2 kV.

  • ICC Value: USD 291.620

  • Node Price Reference: Itahue

  • Altitude: 185 m.

  • Minning Rights: In Process

  • Environmental Status: OK

  • IFC Status: In Process

COMMERCIALS CONDITIONS

  1. Development and finish construction: 1 year.

  2. Construction time: 6 months.

  3. Operation time: 25 years.

  4. Payments:

  5. Project sale Price:

OPPORTUNITIES

  • Limited supply of PMGD projects that can benefit from a stabilized price

  • Project in central zone, with good radiation.

  • Possibility of accumulating without reducing daily injection

STRENGHTS

  • Project received at a stabilized price.

  • Use of land suitable for the type of project.

  • Cheap interconnection of a few meters of line and short easements.

  • Development cost included.

  • Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.

  • Reduced deadlines to start receiving income, less than a year.

STUDIES & AVALAIBLE INFORMATION

  • Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.

  • Studies and analysisfor sectorial permits.

  • Minning Cadastre.

  • Basic Engineering of interconnection and comunicationsfor 6.5 MW Project.

  • Topography studies.

  • Hidrology studies.

  • Preliminary Soil test.

  • Irradiation studies.

  • Real estate titles studies.