Renewable Energy Projects
PV - Mulchen-Santa Bárbara [MSB]
Photovoltaic Parks: Projects & Business Development
SOLAR Project: 9 MWp
23,5 hectares.
Yield: 1.900 kwh/m2/year.
Interconnection Distance: 150 m.
Voltage connection: 23 kV.
ICC Value: USD 179.351
Node Price Reference: Charrúa
Altitude: 150 m.
Minning Rights: In Process
Environmental Status: In Process
IFC Status: In Process
COMMERCIALS CONDITIONS
Development and finish construction: 1 year
Construction time: 6 months.
Operation time: 25 years.
Payments:
Project sale Price:
OPPORTUNITIES
Limited supply of PMGD projects that can benefit from a stabilized price
WEAKNESSES
Irradiation lower than projects located in RM, VI, VII region.
STRENGHTS
Project received at a stabilized price.
Use of land suitable for the type of project.
Cheap interconnection of a few meters of line and short easements.
Development cost included.
Location close to major cities, reduces cost of transport of material, workers, no need for mancamp, etc.
Reduced deadlines to start receiving income, less than a year.
THREATS
Social instability in the region south of the project
STUDIES & AVALAIBLE INFORMATION
Enviromental base line (human studies, Flora and fauna, archeologyst, landscape, river channels, etc.
Studies and analysisfor sectorial permits.
Minning Cadastre.
Basic Engineering of interconnection and comunicationsfor 9 MW Project.
Topography studies.
Hidrology studies.
Preliminary Soil test.
Irradiation studies.
Real estate titles studies.